[1]刘红文,刘春秀,万宇宾,等.基于FAST和Simulink的大型风电机组仿真与性能分析[J].控制与信息技术(原大功率变流技术),2012,(05):34-37.[doi:10.13889/j.issn.2095-3631.2012.05.012]
 LIU Hong-wen,LIU Chun-xiu,WAN Yu-bin,et al.Simulation and Performance Analysis of Large-scale Wind Turbine Based on FAST and Simulink[J].High Power Converter Technology,2012,(05):34-37.[doi:10.13889/j.issn.2095-3631.2012.05.012]
点击复制

基于FAST和Simulink的大型风电机组仿真与性能分析()
分享到:

《控制与信息技术》(原《大功率变流技术》)[ISSN:2095-3631/CN:43-1486/U]

卷:
期数:
2012年05期
页码:
34-37
栏目:
绿色能源与节能
出版日期:
2012-10-05

文章信息/Info

Title:
Simulation and Performance Analysis of Large-scale Wind Turbine Based on FAST and Simulink
文章编号:
2095-3631(2012)05-0034-04
作者:
刘红文刘春秀万宇宾杜佳佳王靛王立鹏
南车株洲电力机车研究所有限公司
Author(s):
LIU Hong-wen LIU Chun-xiu WAN Yu-bin DU JIA-jia WANG Dian WANG Li-peng
( CSR Zhuzhou Institute Co.,Ltd., Zhuzhou, Hunan 412001,China )
关键词:
大型风电机组建模动态性能仿真
Keywords:
large-scale wind turbine modeling dynamic performance simulation
分类号:
TM315
DOI:
10.13889/j.issn.2095-3631.2012.05.012
文献标志码:
A
摘要:
叙述了大型风电机组的风轮系统、传动链系统、发电机系统以及控制系统。以5 MW 双馈风电机组为研究对象,利用FAST 建立风电机组模型,利用Simulink 设计控制器,并以定常风工况和IEC 湍流风工况进行仿真验证,以此分析大型风电机组的动态性能。结果表明,本文仿真模型正确,可以用于大型风电机组设计仿真。
Abstract:
Rotor system, drive chain system, generator system and control system of large-scale wind turbine are described in this paper. Taking a 5 MW doubly fed wind turbine as a research object, the model of wind turbine is established through FAST software and the controller is designed with Simulink. Therefore, the dynamic performance of large-scale wind turbine is analyzed by the simulation results of steady wind conditions and the IEC turbulent wind conditions. The results show that the simulation model is correct, which can provide a simulation model for designing large wind turbine.

参考文献/References:

[1] Jonkman J M, Buhl J R, Marshall L. FAST User’s Guide[R]. National Renewable Energy Laboratory, 2005.
[2] Pisu P, Ayalew B. Robust Fault Diagnosis for a Horizontal Axis Wind Turbine[C]//18th IFAC World Congress,2011:7055-7060.
 [3] Prats M, Carrasco J M, Galvan E, et al. Improving Transition between Power Optimization and Power Limitation of Variable Speed, Variable Pitch Wind Turbines using Fuzzy Control Techniques [C]//26th Annual Conference of the IEEE,2000:1497-1502.
 [4] Tony B. 风能技术[M]. 武鑫,译. 北京:科学出版社,2007 .
 [5] Jonkman J, Butterfield S, Musial W, et al. Definition of a 5 MW Reference Wind Turbine for Offshore System Development[R]. National Renewable Energy Laboratory, 2009.

相似文献/References:

[1]闫勋.混合型EMI滤波器的建模与仿真研究[J].控制与信息技术(原大功率变流技术),2012,(04):17.[doi:10.13889/j.issn.2095-3631.2012.04.002]
 YAN Xun.Research on Modeling and Simulation of Mixed EMI Filter[J].High Power Converter Technology,2012,(05):17.[doi:10.13889/j.issn.2095-3631.2012.04.002]
[2]胡书举,孟岩峰,宋 斌,等.大型风电机组传动链测试系统国内外现状及展望[J].控制与信息技术(原大功率变流技术),2017,(06):10.[doi:10.13889/j.issn.2095-3631.2017.06.002]
 HU Shuju,MENG Yanfeng,SONG Bin,et al.Current Situation and Prospect of Large-scale Wind Turbine Drive-train Test System at Home and Abroad[J].High Power Converter Technology,2017,(05):10.[doi:10.13889/j.issn.2095-3631.2017.06.002]

备注/Memo

备注/Memo:
收稿日期:2012- 03- 30
作者简介:刘红文(1982- ),男,硕士,工程师,从事风力发电机组系统研发及整机控制策略的研究工作。
更新日期/Last Update: 2016-11-29